Candidate
Name:
Goldie Moore
Contract Position: RF Engineer
Phone: (443)722-2495
email: gmoorebmore@gmail.com
C4 Technical
solutions
July 2013-Aug 2012
·
Served
as RF Engineer
·
DUW
Integration
·
Installed
RAX/TX For 3206
·
CBU
Integration
·
Call
test (E911)
·
Terminated
T1,s
Prithvi
Solutions
Feb 2013-July 2013
·
TMO
MODERNIZATION
·
Lead
RF Engineer
·
Installed
and commissioned Ericsson6000 series cabinets
·
Provisioned
DUL
·
2C
Power upgrade on existing 3000 series cabinet.
·
AWS
and PCS integration
·
Terminated
Fiber and Power
·
Router
and DU Trouble shooting
WNG
July 2012 to Nov 2012
· TMO MODERNIZATION
· Lead RF engineer
· Installed and
commissioned Ericsson 6000 series cabinets
· Power upgrade on
existing 3000 series cabinet
· Troubleshoot
ALU7705 router
· Performed
optimization of existing cabinets
· Terminated hybrid
cables for AIR 21 antenna
AFL Networks
Sep 2011 to Dec 2011
·
Served
as RF Engineer
·
1
thru 4 carrier commissioning and integration.(North/South Carolina Market)
·
Ericson
Site Readiness Checklist
·
Smart
Laptop
·
E911
testing
·
Cabinets:
3106,3206,3418,3518
VERSACOM
Nov 2010 to Sep 2011
· RF Engineer/Field
Tech
· 2nd carrier adds in
the Connecticut market for Versacom
· Commissioning,
integration and troubleshooting of UMTS 3106 and 3206 cabinets for
T-mobile and AT&T
· Installation and
site integration of 3418/3518 RRU's
· Call E911 testing
· 2nd carrier adds in
the Connecticut market for Versacom
· Commissioning,
integration and troubleshooting of UMTS 3106 and 3206 cabinets for
T-mobile and AT&T
· Installation and
site integration of 3418/3518 RRU's
· Call E911 testing
MOBILECOM
Jun 2008 to Feb 2009
·
Drive
Tester for Ericsson/AT&T 3G project for California Northern and Southern
markets
·
GNG
Cluster Test driving using Agilent 11.2, 11.3
·
collected
data using project based setup and file based setup
·
Dual
band testing using TEMS with two scanners and also one scanner
3S
NETWORK
Jun 2007 to Feb 2008
·
Drive
Tester for Ericsson/AT&T 3G project for Virginia market
·
Pre-launch GNG Cluster Test drive using Agilent 9.3 (Kit1
& Kit2), 11.1 post drive using
Tems 8.1, Map Info, GPS 2008 Microsoft Street and Trips.
·
Post drive optimization with Tems-investigation tools
·
Analyze collected data
·
Provided RF engineers daily reports via FTP servers of trouble
issues found in the network.
·
Assisted RF Engineers to analyze and post process data gathered
during drive test using Tems Investigation and Map Info.
·
Cell
site verification,
·
Soft
and Hard HO troubleshooting,
·
E-911
tests.
2